500W 24V Well-Pump Solar Wiring Diagram with Battery (2S1P)
Computed 500W 24V well pump solar diagram: 2S1P array, wire gauges, OCPD, battery arrangement, routed parts and printable files.

View the scalable diagram inline
What this computed plan shows
For the 500W 24V Well-Pump Solar Wiring Diagram with Battery (2S1P), a 2S1P array gives 500 W of rated panel capacity for the well pump use case. Nameplate multiplication produces 60 Voc, 51 Vmp and 10.2 Isc at the combined array. Those values are carried forward into controller and conductor checks instead of being rounded into a one-size-fits-all diagram.
At the charge controller, the drawing records a 27 A minimum and a 75 V design Voc. Those are different questions: one protects adequate charging output, while the other keeps the 2S1P string below the equipment’s 150 V input limit. Both checks return within for this exact 500W 24V Well-Pump Solar Wiring Diagram with Battery (2S1P) state.
The array-to-controller route is 20 ft one way and carries 15.9 design amps. It resolves to 12 AWG copper, a 20 A OCPD and 2.47% calculated drop. Downstream, the 7 ft controller lead uses 10 AWG copper behind 30 A protection, holding its computed drop to 1.51%.
Storage is drawn as 2S3P: 6 LiFePO₄ units, each 200 Ah. That produces 600 Ah at 24 V and 15,360 Wh nominal. The complete-series-string rule is why the count and arrangement appear together rather than as an interchangeable battery total.
A 1,950 W continuous inverter draws about 90.3 A from this 24 V bank under the stated efficiency assumption. The 2 ft feed therefore becomes 1/0 AWG copper, protected at 125 A and calculated at 0.18% drop. Keeping this high-current run short is usually more effective than buying around a poor layout.
All three schedule rows pass the shared ampacity and voltage-drop checks for the inputs printed here. That does not account for every field condition, including conduit fill, grouped conductors, engine-room heat, corrosion exposure or manufacturer-specific terminal limits. Treat the 500W 24V Well-Pump Solar Wiring Diagram with Battery (2S1P) as a traceable calculation snapshot and have work reviewed whenever the installation falls outside its displayed assumptions.
For later comparison, keep the 500 W array, 2S3P bank and the 20/7/2 ft one-way routes together when requesting equipment quotes or an inspection review.
Wire, protection and battery schedules
Wire schedule
| Segment | Design current | One-way run | Computed conductor | Voltage drop | Sizing basis |
|---|---|---|---|---|---|
| array → controller | 15.9 A | 20 ft | 12 AWG copper | 2.47% | 156% of array Isc (NEC 690.8) |
| controller → battery | 20.8 A | 7 ft | 10 AWG copper | 1.51% | controller output at 125% continuous-load ampacity |
| battery → inverter | 90.3 A | 2 ft | 1/0 AWG copper | 0.18% | inverter continuous DC input at 90% efficiency and 125% ampacity |
Overcurrent protection
| Protected segment | Required ampacity | OCPD | Conductor ampacity | Verdict |
|---|---|---|---|---|
| array → controller | 15.9 A | 20 A | 20 A | within |
| controller → battery | 26 A | 30 A | 30 A | within |
| battery → inverter | 112.8 A | 125 A | 125 A | within |
Battery arrangement
| Arrangement | Chemistry | Units | Unit capacity | Bank capacity | Nominal energy | Nominal voltage |
|---|---|---|---|---|---|---|
| 2S3P | LiFePO₄ | 6 | 200 Ah | 600 Ah | 15,360 Wh | 24 V |
Static routed parts list
Parts are computed from this passing configuration. A route appears only when the verified catalogue record proves every displayed numeric rating; all uncertain matches stay local for verification. Routed links may earn Off Grid Authority a commission at no extra cost to you.
Pre-install review steps
- Confirm the array and controller window: Verify that the 2S1P string plan produces 60 V open circuit and that the equipment is rated above the 75 V cold-design value.
- Lay out the protected DC runs: Measure the one-way paths before ordering cable, then compare them with the computed 20 ft, 7 ft and 2 ft runs shown here.
- Build complete battery strings: Arrange all 6 battery units as 2S3P; do not leave a partial series string in a 24 V bank.
- Commission against equipment instructions: Check polarity, terminal torque, DC interrupt ratings, conductor temperature ratings, ambient correction and local inspection requirements before energizing the 1,950 W inverter.
Customize or compare
Open the parent build guide for the surrounding design context, safety notes and installation discussion.